Logistics
Preparing the site for a container: foundation, access and delivery
Choosing pad or slab foundations, the access a truck and crane need, and what to check when a container or modular home is delivered.
Containere Romania5 min
Most installation delays have nothing to do with the container. They happen because the crane has nowhere to stand, the truck doesn't fit down the road or the foundation isn't level.
Foundation types
| Type | Best for | Notes |
|---|---|---|
| Concrete pads | One or a few modules, stable ground | At least at the corners; more along long modules |
| Screw piles | Sloping or soft ground, fast installation | Height-adjustable and removable |
| Reinforced concrete slab | Permanent buildings, several modules | Most stable; must be designed by an engineer |
Whatever the foundation, all supports must be level. A container sitting crooked jams its doors and windows. Size and depth are set by an engineer based on the soil.
Transport access
- An access road wide and firm enough for a heavy truck, including bends and the gate.
- No overhead cables, branches or balconies above the unloading area.
- A flat, firm spot for the crane close to the plot.
- Narrow or weight-restricted public roads may need extra approvals.
On delivery
- Inspect panels, corners and windows before signing the transport papers.
- Open and close every door and window once the module is set down.
- Photograph any damage and note it on the delivery document.